Conversations with the builders are underway regarding a start date for construction.
To reduce construction time, reduce cost and increase the amount of park features we are seeking in-kind donations. If we get enough in-kind donations, we will be able to construct a concrete mini ramp within the park footprint, thus achieving the full park design.
Below is a list of the higher cost items.
If you, or know somebody who has a lead on any of the items below, please contact [email protected]
Lodging
The construction is expected to last 8 to 12 weeks. We are seeking a house/condo in the area that can house the construction team (8 adults) for the duration of the time.
Concrete
Securing a concrete discount or donation will amount to a HUGE savings for us.
- 140 cubic yards of concrete
- 40 bags of concrete
Equipment
This equipment will be used for construction time frame of 8 to 12 weeks.
- Mini-Excavator
- Bobcat or skid steer
Materials
- Rebar (#3): 20ft. Sticks | 650 Sticks
- Rebar (#4): 20’ Sticks | 100 Sticks
- Rebar Ties: 2 Cases
- 2’x4’x16’ Spruce 200 Units
- 3⁄4” Plywood AC 25 Units
- Masonite 5 Sheets
- Straight Forms – 1×6 | 500 Linear Feet
- Round forms – 1×6 Miratek 100 Linear Feet
- Steel Stakes (24” long) 100
Keep Pushing
Having a baseline understanding of the in-kind donations will help the builders finalize their plans for a start date. We’re almost there. Keep pushing.